Road El-Farag Bridge
Because our company has great potential as well as long experiences and good reputation
Our company has been selected to carry out the important work in the construction of the new bridge which is now completed
This bridge has been completed in Cairo in the neighborhood of Rod al-Faraj and this bridge linking Cairo and Giza
Our company also provided several different load cranes as well as a 400 ton crawler crane
300 Ton Crawler Crane - Each crane is placed on a water barge as pictured